Sugar Brown MSMEs was established in 2000 in West Sumatera, Indonesia. This MSMEs produces brown sugar. This MSMEs doesn’t have time standard in the production of brown sugar, the corporation is unable to precisely estimate the number of workers required based on the workload at each work station. Many hours are lost because employees have a lengthy amount of free time to work. In order for the business to identify effective working hours and boost productivity, as well as determine daily production, the research aims to investigate standard time by accounting for the average observation time and the typical amount of time needed for employees to finish the brown sugar production process. Time study is used in the qualitative research methodology. Primary data is the source of the data. A stopwatch is used to record working time data, and Westinghouse is the type of adjustment employed. After gathering data on employee working hours, the data is tested for consistency. Operator work is examined, operator working time is computed, the number of requests to be received is estimated, the workload of each work station is determined, and the number of workers is determined based on the workload. Result of the research found that the sap water collection activity yielded research data indicating that the time taken was 108.42 minutes on average, 89.98 minutes on normal, and 113.89 minutes on standard. The sap water boiling operation took an average of 7.92 hours, 6.57 hours on average, and 8.31 hours on standard. The standard time for the Brown sugar printing operation was 92.24 minutes, the normal time was 72.87 minutes, and the average time was 87.8 minutes. The packing operation took an average of 23 minutes, 19.09 minutes on average, and 24.16 minutes on average.
References
Al Faridzi, S., Kusnadi, K., & Hamdani, H. (2022). Pengukuran waktu baku untuk menentukan produktivitas karyawan dengan menggunakan metode jam henti (studi kasus CV. Mulia Tata Sejahtera). Jurnal Serambi Engineering, 7(1), 2693–2700. https://doi.org/10.32672/jse.v7i1.3832
Amalia, A. N., & Sriyanto. (2018). Penetapan standar proses dan pengukuran waktu standar pada produksi tahu baxo Ibu Pudji (studi kasus: CV Pudji Lestari Sentosa). Industrial Engineering Online Journal, 6(7), 1–4.
Cahyani, E., & Indriani, W. (2022). Analisis pengukuran dan standar waktu kerja pada pelayanan pembuatan surat di kantor camat Kecamatan Makarti Jaya (studi kasus Kabupaten Banyuasin). Jurnal Kompetitif, 11(1), 80–90. https://doi.org/10.52333/kompetitif.v11i1.905
Cevikcan, E., Kılıç, H. S., & Zaim, S. (2012). Westinghouse method oriented fuzzy rule based tempo rating approach. In Proceedings of the International Conference on Industrial Engineering and Operations Management (pp. 1670–1677).
Cury, P. H. A., & Saraiva, J. (2018). Time and motion study applied to a production line of organic lenses in Manaus industrial hub. Gestão & Produção, 25(4), 901–915. https://doi.org/10.1590/0104-530X2881-18
Hidayat, M. F., & Cahyo, W. N. (2023). Design and development of broiler farm dashboard: Enhancing farm management decision-making and performance measurement. 7(1), 82–94.
Hudaningsih, N., Mashabai, I., & Prayoga, R. (2019). Analisa pengukuran beban kerja dengan metode stopwatch time study dan FTE di UD. Prasetya Rangga. Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi, 8(1), 50–63. https://doi.org/10.31001/tekinfo.v8i1.697
Kiraz, A., Toklu, M. C., & Adali, M. R. (2021). A new approach to Westinghouse tempo rating system with fuzzy logic. Endüstri Mühendisliği, 32(1), 55–68. https://doi.org/10.46465/endustrimuhendisligi.809160
Krisnaningsih, E., Dwiyatno, S., & Sasongko, R. (2020). Usulan penentuan waktu baku pada operator packing folding kain tetoron rayon dengan metode stopwatch. Intent: Jurnal Industri dan Teknologi Terpadu, 3(2), 67–81.
Kusuma, T. Y. T., & Firdaus, M. F. S. (2019). Penentuan jumlah tenaga kerja optimal untuk peningkatan produktivitas kerja (studi kasus: UD. Rekayasa Wangdi W). Integrated Lab Journal, 7(2), 26–36.
Latief, A., Melu, P. F., Lahay, I. H., & Hasanuddin. (2021). Pengukuran waktu kerja karyawan pada pengemasan es kristal menggunakan metode time study. JAMBURA Industrial Review, 1(2), 48–57. https://doi.org/10.37905/jirev.1.2.48-57
Masniar, M., & Maga, M. (2019). Analisis waktu pembuatan noken menggunakan metode jam henti (stopwatch time study). Metode: Jurnal Teknik Industri, 5(1), 1–7. https://doi.org/10.33506/mt.v5i1.1514
Nurpratama, R. A., Nursanti, E., & H. G. W. (2019). Pengukuran waktu standar dan beban kerja untuk alokasi penentuan jumlah pekerja helper di PT. PJB UBJOM Tuban. Valtech Journal, 2(2), 131–138.
Nurvitarini, D. Y., Rahman, A., & Dessy. (2016). Penentuan jumlah operator berdasarkan analisa beban kerja fisik dengan pertimbangan cardiovascular load (studi kasus: Pabrik Gondorukem dan Terpentin Garahan Jember). Jurnal Rekayasa dan Manajemen Sistem Industri, 3(3), 536–545.
Purbasari, A. (2020). Pengukuran waktu baku pada proses pemasangan IC program menggunakan metode jam henti. Profisiensi: Jurnal Program Studi Teknik Industri, 8(2), 116–128. https://doi.org/10.33373/profis.v8i2.2805
Rachman, T. (2013). Penggunaan metode work sampling untuk menghitung waktu baku dan kapasitas produksi karungan soap chip di PT. SA. InovisiTM, 9(1), 48.
Ramadhani, A. S. (2020). Pengukuran waktu baku dan analisis beban kerja untuk menentukan jumlah optimal tenaga kerja pada proses cetak produk lipstick. Operations Excellence: Journal of Applied Industrial Engineering, 12(2), 177. https://doi.org/10.22441/oe.2020.v12.i2.004
Sari, E. M., & Darmawan, M. M. (2020). Pengukuran waktu baku dan analisis beban kerja pada proses filling dan packing produk lulur mandi di PT. Gloria Origita Cosmetics. Asiimetrik: Jurnal Ilmiah Rekayasa Inovasi, 2(1), 51–61. https://doi.org/10.35814/asiimetrik.v2i1.1253
Sari, S., Imron, F. F., Nurfajriah, N., & Rahayu, F. I. M. (2022). Workload analysis with full time equivalent method to optimize production unit performance at PT X. Journal of Integrated Systems, 5(2), 173–183. https://doi.org/10.28932/jis.v5i2.5404
Yudisha, N. (2021). Perhitungan waktu baku menggunakan metode jam henti pada proses bottling. Jurnal Vorteks, 2(2), 85–90. https://doi.org/10.54123/vorteks.v2i2.73
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Winny Alna Marlina, Armijal, Syaiful Anwar

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish their manuscripts in this journal agree to the following conditions:
- The copyright on each article belongs to the author(s).
- The author acknowledges that the Dinasti International Journal of Economics, Finance & Accounting (DIJEFA) has the right to be the first to publish with a Creative Commons Attribution 4.0 International license (Attribution 4.0 International (CC BY 4.0).
- Authors can submit articles separately, arrange for the non-exclusive distribution of manuscripts that have been published in this journal into other versions (e.g., sent to the author's institutional repository, publication into books, etc.), by acknowledging that the manuscript has been published for the first time in the Dinasti International Journal of Economics, Finance & Accounting (DIJEFA).